Changes to the Retention Money Regime for Construction Contracts
The new Construction Contracts (Retention Money) Amendment Bill proposes to change the way contractors hold retention money under construction contracts.
The current regime allows contractors to mingle retention money with working capital, which can result in subcontractors missing out on money owed to them if the contractor goes into liquidation. This happened in the liquidation of Mainzeal Property and Construction Limited in 2013.
The proposed legislation aims to put clear rules in place around how retention money is to be held to provide protection for subcontractors.
Key changes: The Bill proposes that contractors must:
• Place retention money on trust as soon as possible and keep it separate from other money or assets, and
• Hold retention money in a trust account in a registered bank in New Zealand or in the form of complying instruments (such as an insurance policy or a guarantee).
The Select Committee is expected to report on the Bill in November 2021. Contractors will need to be prepared for the changes when the Bill passes, as failure to comply could result in significant fines.
DISCLAIMER: All the information published in Commercial eSpeaking is true and accurate to the best of the authors' knowledge. It should not be a substitute for legal advice. No liability is assumed by the authors or publisher for losses suffered by any person or organisation relying directly or indirectly on this article. Views expressed are those of individual authors, and do not necessarily reflect the view of this firm. Articles appearing in Commercial eSpeaking may be reproduced with prior approval from the editor and credit given to the source. Copyright, NZ LAW Limited, 2019. Editor: Adrienne Olsen. E-mail: adrienne@adroite.co.nz. Ph: 029 286 3650 or 04 496 5513.