LIM Condition
The Land Information Memorandum (LIM) ‘report’ condition is another condition often included in the agreement for the buyer’s benefit.
A LIM is prepared by the local council and is obtained at the buyer’s cost. The LIM has information on the positioning of stormwater and sewerage pipes, whether there has been flooding in the area, drinking water quality, council rates, building certificates, consents and compliance, and special land features such as historical sites and sites which are significant to Māori. All this is worth knowing before buying a property.
If you are happy with the LIM, you can satisfy the condition by approving the report by the due date in the agreement. We will notify the seller’s lawyer that the condition is satisfied.
If you do not approve the LIM (on reasonable grounds), you may have to give notice to the seller stating your reasons. The seller may agree to undertake remedial works to correct these concerns. If so, this condition will be satisfied. However, the seller can respond that they are unable, or unwilling, to do so. In this case, the agreement can be cancelled.
DISCLAIMER: All the information published is true and accurate to the best of the authors’ knowledge. It should not be a substitute for legal advice. No liability is assumed by the authors or publisher for losses suffered by any person or organisation relying directly or indirectly on this article. Views expressed are those of individual authors, and do not necessarily reflect the view of this firm. Articles appearing in this newsletter may be reproduced with prior approval from the editor and credit given to the source. Copyright, NZ LAW Limited, 2019. Editor: Adrienne Olsen. E-mail: adrienne@adroite.co.nz. Ph: 029 286 3650 or 04 496 5513